01 / THE BIG PICTURE
Start with the essentials.
A useful enquiry explains the desired outcome, the existing equipment and the conditions in which the work must happen. These details help identify what is included and what needs further inspection.
02 / STEP BY STEP
A practical sequence.
- 01
Define the outcome
Repair a fault, replace equipment, install a new system, plan servicing or prepare drawings.
- 02
Document the current condition
Collect model details, quantities, photographs, dimensions and available plans.
- 03
Explain site constraints
Include permitted working hours, access restrictions, shutdown windows and occupied areas.
- 04
Review the scope
Check the proposed materials, labour, reinstatement, testing, exclusions and timing.
03 / LOOK A LITTLE CLOSER
The details that matter.
Photographs that help
Include a general view showing location and access, a readable nameplate, the affected component and the connection route. Photographs should complement measurements rather than replace them.
Think beyond the equipment
Replacement work may also involve dismantling, lifting, drainage, electrical reconnection, pipe modifications, insulation and making good. Confirm which items apply.
Confirm before ordering
Model compatibility, connection dimensions, bearing references and valve specifications should be verified before materials are selected. An approximate size is not a procurement specification.
04 / AT A GLANCE
Keep these distinctions clear.
| Information | What to provide | Why it helps |
|---|---|---|
| Equipment | Type, model, quantity and nameplate | Helps identify the correct system and components. |
| Site | Location, access and photographs | Helps plan labour, access equipment and coordination. |
| Timing | Working hours and shutdown allowance | Helps define a realistic programme. |
| Deliverables | Testing, reports, drawings and reinstatement | Helps make the quotation scope comparable. |
THE KEY TAKEAWAY
A site visit may still be needed. The purpose of a clear brief is to reduce missing information, not to replace the checks required for an accurate proposal.
05 / COMMON QUESTIONS
Good questions to ask.
Should quotations always include making good?
It depends on the agreed scope. Wall, ceiling and insulation reinstatement should be explicitly addressed where disturbed.
Can I request an itemised quotation?
Yes. Explain the breakdown you need and the documents required for your approval process.
This guide explains typical arrangements. Equipment selection, technical settings and repair procedures must follow the actual system design and manufacturer’s instructions.



